 Betreff des Beitrags: Shuttering System Magnet suppliers
BeitragVerfasst: 2. Sep 2019 02:50 
Offline

Registriert: 09.2019
Beiträge: 10
Geschlecht: nicht angegeben
Precast Concrete Magnetic Side Formwork
Keywords:
Shuttering Magnet, Concrete Magnet, Magnetic Formwork, Precast Concrete Magnet, Magnetic Box, Shutter Magnet, Magnet Precast Magnet, Concrete Formwork Magnet, Magnet for Precast Formwork, Construction Magnet, Magnet for Concrete Formwork, U60 Profile Shuttering System With Magnets, Plywood Formwork Magnet, Formwork Systems, Magnetic Formwork
Description of Precast Concrete Magnetic Side Formwork
This formwork-system, consist of a formwork-profile (steel) with integrated magnetic tension-mechanism, which can be used in different formworks. It is especially suitable for the production of flagrant- respectively double walls and lattice girder ceilings.
By mean of the tension-mechanism, the profile (layer is planed) is pulled to the bottom of the shuttering, so that an exactly edge of the manufactured item is managed. For the system is one unit, measuring mistakes are not possible. The easy and quick handling increases the work safety. Using the corresponding lever, the system can be taken off and removed easily from the bottom of the shuttering.
By mean of the separated arrangement of tension mechanism and handle-knob, and tension mechanism and shuttering, the forces acting on the formwork and on the magnet during the concrete process are absorbed.
The built-in tension elements are placed in a save position, so that the formwork-system is less sensitive against soiling.
Note: Recess profiles before first using into oil!
To make possible a stacking up, and to prevent that the formwork sticks to each other, the knob is made out of antimagnetic material. The system can also be delivered storeroom- and robot capable.
With defect the old shuttering, by remove from 3 screws, can be easily exchanged.
Declining shapes and dimensions on demand.
Advantage of Precast Concrete Magnetic Side Formwork:
GME Formwork System assembled by a powerful magnets inserted and a U steel out profile. Fast, Secure, Efficient.
Universal system for precast concrete production;
Easy positioning, fasting and releasing;
Suitable for all current formwork robots or manual handling;
Variety heights is available( able to custom made);
Magnets do not have to be placed individually, it is time saving;
Varity length is available according to your requirements;
Many Chamfer option is available for our profile.
Specifications of Precast Concrete Magnetic Side Formwork:
Material: Neodymium Magnets, 3 mm thickness steel profile
Pull force: 900 KG; Customizable.
Size: Standard width: 60 mm
Standard plate form height: 60,65,70,75 or 80 mm
Steel plate: 3 mm
Surface Treatment:
Black Oxidation Treatment, Black Painting and others as per requirements.
Drawing

Pictures of Precast Concrete Magnetic Side Formwork:Shuttering System Magnet suppliers
website:http://www.precastconcretemagnet.com/shuttering-system-magnet/


Nach oben
 Profil  
 
Beiträge der letzten Zeit anzeigen:  Sortiere nach  
Ein neues Thema erstellen Auf das Thema antworten  [ 1 Beitrag ] 

Alle Zeiten sind UTC + 1 Stunde


Wer ist online?

Mitglieder in diesem Forum: 0 Mitglieder und 1 Gast


Du darfst keine neuen Themen in diesem Forum erstellen.
Du darfst keine Antworten zu Themen in diesem Forum erstellen.
Du darfst deine Beiträge in diesem Forum nicht ändern.
Du darfst deine Beiträge in diesem Forum nicht löschen.
Du darfst keine Dateianhänge in diesem Forum erstellen.

Suche nach:
Gehe zu:  
cron
© phpBB® Forum Software | phpBB3 Forum von phpBB8.de
» Kontakt & Rechtliches Support / Hilfe Forum Gooof Webdesign Kostenloses Forum Dein Forumo Forum web tracker